In Partnership with AOL

  • The Mountaintop Marvel - Description of the Tennessee Valley Authority facility, with pictures and diagram. Cost $300 million in 1979, and generates 1.6 million kilowatts for 20 hours.
    [!]
  • TVA: Raccoon Mountain Pumped-Storage Plant - Picture of lake, with facts and figures. Includes visitor center hours, and link to downloadable (pdf) brochure.
    [!]
Volunteer to edit this category.
Copyright © 1998-2014 AOL Inc. Terms of Use
Visit our sister sites  mozilla.org | MusicMoz | Wikipedia

Last update: May 30, 2013 at 12:37:55 UTC - edit