In Partnership with AOL

  • Heimifeng pumped storage plant moves ahead - Modern Power Systems Magazine describes Alstom order and schedule. Includes plans for Guangzhou I (4 x 306 MW), Shahe (2 x 51 MW), Zhanghewan (4 x 255 MW) Bailianhe ( 4 x 306 MW), Huizou (8 x 306 MW) and Baoquan (4 x 306 MW). (January 27, 2006)
    [!]
Volunteer to edit this category.
Copyright © 1998-2014 AOL Inc. Terms of Use
Visit our sister sites  mozilla.org | MusicMoz | Wikipedia

Last update: January 2, 2007 at 18:00:46 UTC - edit